Installing foundations and drainage to serve 36 apartments in a multi residential development in Sheffield. We are currently in the process of completing phase 2 for the same client.
High pressure injection grouting of redundant mine shaft to stabilise and prevent collapse. One metre deep concrete cap with 40mm thick reinforcement to allow development of clients service yard.
Acting as main contractor we constructed foundations and heavily reinforced ground beams for a galvanising warehouse extension. As part of the project we also installed steelwork and cladding for a turn-key project.
Constructing a 150m long x 3.0m high x 8.0m wide earth bund incorporating a geogrid stabilisation material to create a very well protected site from previous flooding problems.